OUR WORK

Faith

Riverland Hills Baptist Church

Columbia • South Carolina

The Riverland Hills Church project is a new 1200 seat modern worship center featuring a large stage with tiered seating, new lobby & gathering space and associated classroom space. We replaced two air-cooled chillers and associated piping. New piping was added in the main mechanical room along with updated controls and new chilled water pumps. We added three new air handlers in the mechanical room at the mezzanine of the worship center along with associated piping and ductwork. VAV’s were added off of one of these air handlers that serves the classrooms and other smaller spaces that required individual temperature control.

Download the PDF file here.
See The Project Sheet

To view larger, click on the items below.
If you are interested in discussing a project with us, contact the W.O. Blackstone Team.

No items found.

W.O.B. DELIVERS

The W.O. Blackstone team can help provide the right solution for your building with optimal indoor air quality and backed by our exceptional 24/7,  365 days service and maintenance program.

Jeff Griffin

Owner and President
803.381.7336jgriffin@woblackstone.com

Lee Adams

Executive Vice President, COO
803-252-8222ladams@woblackstone.com

Jay Moras

Vice President, Sr. Project Manager
803-252-8222jmoras@woblackstone.com

Roman Otto

Vice President, Sr. Project Manager
803-252-8222rotto@woblackstone.com

Daniel Branham

Project Manager
803.252.8222dbranham@woblackstone.com